Global AI Infrastructure Initiative — Est. 2024

Cities Built
for Intelligence

The world’s first sovereign-scale, nuclear and renewable-powered AI compute cities. Institutional access for investors, EPC partners, capital providers, and strategic operators.

$180B+
Infrastructure Target
20+
Node Locations
1–2 GW
Per Node Capacity
PUE 1.12
Avg Efficiency
Scroll
What We Build

Infrastructure at a scale the world has never attempted

Zero-Carbon Power
SMR nuclear, utility-scale solar, geothermal and BESS — engineered for 1–2 GW sustained AI workloads with 100% zero-carbon certification and PUE ≤ 1.15.
Hardened Construction
Blast-hardened modular facilities, seismic isolation, EMI shielding, precision liquid loop integration and full BIM Level 3 documentation across all node locations.
Institutional Capital
Sovereign wealth, green bonds, sukuk, project finance, mezzanine, REIT/InvIT structures and direct MDB access — every instrument for $100M to $10B+ deployments.
Frontier AI Compute
GPU clusters, custom ASICs, HBM4 memory, photonic interconnects and InfiniBand NDR 400G fabric — purpose-engineered for frontier AI training at scale.
Sovereign Security
Zero-trust architecture, biometric perimeters, anti-drone interdiction, robotic NOC operations and ZTNA — designed for nation-state grade threat environments.
Full Compliance Stack
Institutional KYC/AML, FCPA attestations, ITAR/EAR controls, OFAC screening, GDPR and cryptographically signed e-signatures on an immutable ledger.
Investor Relations

Built for the world’s most demanding capital allocators

AI Cities is structured to meet the governance, transparency and return requirements of sovereign wealth funds, pension funds, family offices and infrastructure-focused institutional investors.

Target IRR 18–24% gross across equity tranches
REIT / InvIT / SPV structures available per jurisdiction
CBI-certified green bond and sukuk issuance frameworks
Quarterly LP reporting with immutable on-chain ledger
$180B+
Total Infrastructure Target
20+
Sovereign Node Locations
1–2 GW
Per-Node Capacity
10+
Nations with Active Agreements
18–24%
Target Gross IRR (Equity Tranche)
OFAC Compliant
ISO 27001 Certified
TLS 1.3 / AES-256
GDPR Sovereign Data
FATF Rec. 24 KYC/AML
Zero Carbon Mandate
24/7 Uptime SLA
Institutional Access Portal

Your gateway to sovereign AI infrastructure

Registration opens access to technical blueprints, capital frameworks, procurement opportunities and direct C-Suite communication channels. KYC/AML verification required.

$4.2B Largest active RFP (Node-07 Dubai EPC)
14 Open procurement opportunities
3–7 days Average KYC approval timeline
1
2
3
4
5
Identity & Access
All fields marked * are mandatory
Contact your AI Cities relationship manager for an invitation code, or email onboarding@superaiventures.com to request access.
Corporate Identity *
Select the category that best describes your organisation
Investment Fund / Asset ManagerSovereign wealth, pension, private equity, infrastructure fund or family office
EPC / Construction ContractorEngineering, procurement and construction — prime or subcontractor
Technology / OEM SupplierGPU, cooling, power, network or facility technology provider
Government / MDB / DFINational development authority, multilateral or bilateral finance institution
Other Strategic PartnerAcademic institution, standards body, media or other affiliated organisation
Personal & Organisation Details
Declare all natural persons owning or controlling ≥25% of the entity (FATF Rec. 24).
Set Your Portal Password *
Choose a password you will use to sign in to the AI Cities Portal. Minimum 10 characters including one uppercase, one number and one special character.
Enter a password to check strength
Command Center
AI Cities Portal — Enterprise Operations Hub
Pending Review
KYC/AML Review Pending. Your application is under compliance review. Technical blueprints, financial ledgers, bidding engine and C-Suite communications unlock upon approval. Restricted items are marked LOCKED.
Open RFPs
14
+4 this week
Node Locations
20+
10+ nations
Contracted Value
Pending
Awaiting approval
KYC Status
Review
Under review
Live Network Telemetry
Compliance Pipeline
Corporate Registry ScanPassed
EU Sanctions ScreenClear
FCPA E-SignaturesSigned
UBO Mapping ReviewIn Review
OFAC Sanctions ScreenRunning
Biometric LivenessAction Needed
55% Complete
City Node Status
NodeLocationStatusCapacityPUEPower SourceOpen RFPs
NODE-01Abu Dhabi, UAEOperational1.2 GW1.11Solar + SMR3
NODE-02Riyadh, Saudi ArabiaOperational1.0 GW1.13Solar + Grid2
NODE-03SingaporeOperational800 MW1.12Geo + Hydro1
NODE-04Frankfurt, GermanyConstruction1.4 GWNuclear + Wind4
NODE-05Austin, TX USAConstruction2.0 GWSMR + Wind2
NODE-07Dubai, UAEPlanning1.8 GWSolar + SMR3
AI Match Engine
Intelligent partner matching based on your capability profile and geographic coverage
Match Configuration
5 Matched Opportunities — Ranked by Compatibility
97%
Match
Node-07 Dubai — EPC Prime Contractor (Turnkey)
Exceptional match across construction capability, GCC geographic coverage and project finance capacity. Your UBO mapping shows direct UAE sovereign relationships relevant to this procurement.
EPC Turnkey GCC / MENA $4.2B Closes 30 Aug 2026
Open
94%
Match
InfiniBand NDR 400G Network Fabric — Nodes 01–05
Strong match on network infrastructure capability and multi-node deployment experience. Your declared HPC fabric experience aligns with the 400G spine-leaf requirement across 5 active nodes.
Network Infrastructure Multi-Region $850M Closes 20 Sep 2026
Open
91%
Match
Liquid Cooling — Direct-to-Chip (Nodes 01–06)
Very high compatibility with declared thermal management capabilities. Six-node scope aligns with your stated multi-region deployment capacity. Direct-to-chip and immersion system experience confirmed.
Thermal Management GCC + EU + APAC $680M Closes 15 Aug 2026
Open
88%
Match
GPU Cluster — 50,000 H100-class Units (Multi-Node)
High match on compute hardware capability and supply chain scale. H100-class procurement at this volume requires demonstrated hyperscale vendor relationships and export licence documentation.
Compute Hardware Global $3.5B Closing Soon
Closing Soon
85%
Match
SMR Nuclear PPA — Texas, USA (300 MW Baseload, 25yr)
Good match on energy generation capability and North America coverage. SMR nuclear PPA requires FERC licensure and 25-year offtake credit documentation. Long-tenor capital commitment aligns with declared capacity.
Energy Generation North America $1.8B Closes 15 Sep 2026
Open
Match scores are calculated against your declared capability profile, geographic coverage and deployment capacity. Approved Tier unlocks direct bid submission and NDA access for all matched opportunities.